Session 1 (2h) — Platform Implementation & BIM Project Deployment
Objective: Establish the collaboration environment, project structure, and external model integration
- Overview of the CYPE ecosystem and implementation approach
- BIMserver.center as the Common Data Environment (CDE)
- Creating and organizing a BIM project
- Team roles, permissions, and discipline setup
- Uploading IFC files and managing external reference models
- Connecting workflows from Revit through IFC export and BIMserver.center integration
- Open BIM interoperability and publishing workflow
Deliverable: BIM project environment ready for multidisciplinary use, including IFC integration
Session 2 (2h) — Architectural Baseline Implementation
Objective: Define the architectural reference model for all disciplines
- Architectural modeling workflow in CYPE Architecture
- Typologies, libraries, spaces, and documentation outputs
- Publishing the architectural baseline for coordination
Deliverable: Architectural model available as the project reference
Session 3 (2h) — Structural Workflow Implementation
Objective: Deploy structural design integrated with BIM
- Importing the architectural baseline into CYPECAD
- Code selection, materials, and structural system definition
- Load setup and analysis workflow
- Reinforcement generation and main deliverables
- Publishing the structural model to the federated project
- Expansion possibilities of the workflow through additional tools for structural steel design.
Deliverable: Structural model calculated and integrated
Session 4 (2h) — MEP Implementation Workflow (Core Disciplines)
Objective: Introduce essential building services integration
- Fire protection setup and sprinkler network workflow (CYPEFIRE)
- HVAC system definition and reporting (CYPEHVAC)
- Plumbing supply and drainage overview (CYPEPLUMBING)
- Electrical devices, circuits, and calculation workflow (CYPELEC)
Deliverable: MEP disciplines connected within the BIM model
Session 5 (2h) — Coordination, Quantities, Cost, and BIM Delivery
Objective: Finalize implementation with outputs and coordination processes
- Quantity takeoff and cost estimation workflow (Open BIM Quantities)
- Model federation, clash detection, and issue management (Open BIM Model Checker)
- Reporting and best practices for project delivery
Deliverable: Coordinated BIM model with quantities, cost outputs, and issue workflow